MEWP cherry picker cleaning Barclays Bank Glasgow copper-clad high-rise facade
Case Study

Barclays Bank Complex, Glasgow

Multi-method window cleaning across a three-building corporate campus on the River Clyde

3 BuildingsGlasgow RiversideZero Incidents

Project Overview

The Barclays Glasgow Campus is a large, busy multi-building site with extensive glass elevations and a mixture of access restrictions at ground and roof level. The client required a specialist team capable of managing these constraints while delivering a consistent, high-quality finish across three separate blocks.

With offices, public walkways, and riverside footpaths surrounding the complex, maintaining safe work zones and controlling the interface with the public was critical throughout the programme.

3
Buildings
0
Incidents
3
Access Methods
0
Disruptions

Project Details

Client
Barclays Bank
Location
Glasgow Riverside Campus
Service
Full External Window Cleaning
Access Methods
IRATA Rope Access, MEWP, Reach & Wash
Environment
Live Financial Headquarters

The Challenge

Each building presents different challenges, including limited MEWP positioning areas, recessed facades, and pedestrian routes that remain active throughout the day.

  • Limited MEWP positioning

    Restricted ground areas required careful equipment placement planning

  • Recessed facades

    Complex elevation geometry prevented standard access methods

  • Active pedestrian routes

    Public walkways and riverside footpaths required constant management

  • Designated anchor points only

    Rope access limited to certified anchor locations on each building

  • Weather-dependent operations

    All work at height planned around changing conditions

MEWP with safety exclusion barriers at Barclays Glasgow campus

Our Approach

Through careful planning, close communication with the campus team, and controlled execution on site, we delivered the full external cleaning programme with minimal disruption.

Site Assessment

Before work began, our team carried out a detailed assessment of all three buildings. This included reviewing access routes, identifying suitable MEWP positioning areas, confirming certified rope access anchor points, and evaluating ground conditions along the riverside and public walkways.

Safety Controls

We established controlled exclusion zones around all work areas, coordinated with Barclays' site management, and timed parts of the programme to avoid peak pedestrian activity. Our IRATA-trained technicians and IPAF-certified MEWP operators followed strict procedures as outlined in the RAMS.

Coordinated Delivery

Daily updates were provided to ensure all stakeholders were aware of planned work areas, exclusion zones, and equipment movements. Public walkways and entrances were managed with clear signage and banksmen, allowing staff and visitors to move safely around the site.

Multi-Method Delivery

To achieve a consistent and high-quality finish across the entire campus, we used a combination of rope access, MEWP, and Reach & Wash methods tailored to each elevation.

IRATA rope access technicians on Barclays building

IRATA Rope Access

Rope access technicians completed the high-level and recessed glazing where elevation geometry prevented MEWP use. All work from designated anchor points with full rescue procedures in place.

MEWP with exclusion zone barriers at Barclays campus

MEWP Operations

IPAF-certified operatives worked on accessible facades with stable ground conditions, ensuring efficient coverage of mid-level glass. Strict traffic and pedestrian management maintained throughout.

Reach and wash pure water cleaning at Barclays

Reach & Wash

Lower floors and areas with limited access were completed using purified-water Reach & Wash systems, allowing us to clean safely without impacting pedestrian routes or requiring exclusion zones.

Project Gallery

Multi-building Barclays campus with MEWP in operation
MEWP cleaning copper-clad facade at Barclays
Heritage sandstone building with clean windows at Barclays campus
Operative cleaning riverside balcony glass
Multiple rope access technicians on high-rise facade
Safe exclusion zone setup for MEWP operations
Clean heritage facade at Barclays Glasgow campus

Results Delivered

The full external cleaning programme was completed safely, efficiently, and to a high standard across all three buildings. Despite the access challenges and the operational demands of a live financial headquarters, the works were delivered with zero incidents and without interruption to staff or visitors.

Zero safety incidents throughout programme
No disruption to staff or visitors
Consistent high-quality finish across all buildings
Full compliance with site safety requirements

"This project highlights Struan Window Cleaning's ability to plan and execute complex work-at-height operations on multi-building corporate campuses. By combining specialist access methods with detailed planning and strong on-site coordination, we delivered a safe and high-quality service that met Barclays' expectations."

Similar Project Requirements?

Whether you're managing a multi-building campus, corporate headquarters, or complex commercial property, we have the expertise and accreditations to deliver safely and efficiently.

IRATA Full MemberSafeContractor Approved£10m InsuranceEcoVadis SILVER

Optional analytics cookies